The contractor began construction of the Route 123 Sidewalk Improvements on May 1, 2019.


During the week of November 16 – November 22 the Contractor:

  • Continued masonry block and decorative brick installation

  • Continued back fill of retaining wall and brick fence along Chain Bridge Road

  • Continued drilling and pouring for post and panel retaining wall piles

  • Began excavation of temporary benching placed along Chain Bridge Road



Activities planned for the week of November 23 – November 29 include:

  • Continuing CMU block and decorative brick work installation

  • Begin granite curb installation

  • Continuing drilling, setting piles, and back fill for post and panel walls